IT | EN
HOME > NEWS > 2020 > Works on Norwegian Epic has been completed
Share this post
December 2, 2020

Works on Norwegian Epic has been completed

Post tags: Norwegian Cruise Line , tecnavi

Tecnavi concludes the dry dock project on Norwegian Epic.
Works on board have been:

Full replacement of 12 cooling coils.
Full replacement of 18 reheating coils.
Full replacement of 86 zone reheating coils.
Damper replacement on Emergency Diesel Cooler.
Damper replacement on compartment 12 supply duct line.
Full replacement of insulation on 5 chiller evaporators.
Thanks to everybody who was involved in this dry dock! A great job done in such a difficult period!

close